The entire booster system is shipped factory prefabricated on a common structural steel base with all interconnecting piping and wiring completed and operationally tested prior to shipment. The only field connections are the system suction and discharge manifolds and one power connection.
Standard Features:
Copyright © 2019 kingpumpsandsupply.com - All Rights Reserved.